Ohio Minority Supplier Development Council

University of Dayton and Messer Construction Co. to host Economic Inclusion Virtual Community Outreach Session for UD Center for the Arts project Sept. 21 at 3 p.m.

The University of Dayton and Messer Construction Co., are pleased to host an Economic Inclusion Virtual Community Outreach Session for Minority & Women-owned subcontractors and suppliers, interested in bidding or receiving information for the Center for the Arts construction project. During the session, you will meet the project team, learn about Prime Bidders, Tier 1 & Tier 2, MBE & WBE subcontractors and suppliers, the upcoming opportunities to bid on the project, specifications and requirements.

Date: Tuesday, September 21, 2021
Time: 3:00 PM – 4:00 PM (EST)
Location: Zoom Virtual Session

Click Here To Register Now! You must register to receive virtual session details.

REGISTRATION DEADLINE TODAY: Virtual OhioHealth and Messer Construction Economic Inclusion Outreach Session April 14th @ 9 a.m.

Join OhioHealth and Messer Construction Co., as the project team shares details about the Pickerington Methodist Hospital Development and the Riverside BMT construction projects. During the Economic Inclusion Outreach Session, you will learn about the opportunities to bid on both projects, specifications & project requirements. See Bid Packages Information below.

NOTE: Only virtual registration is still available.

Event Date: Wednesday, April 14, 2021
Event Time: (Virtual): 9:00 AM – 10:00 AM
Event Schedule: 9:00 AM – 10:00 AM: Project Overview (In person & virtual)
How To Attend: You must register in advance by Tuesday, April 13th, 2021 to receive log-in details. 

Click Here To Register Now!

BMT Bid Packages

Bid Package #00. Bing Enabling
BC-01   Messer Self Performance

  • Demo
  • Concrete
  • General Requirements
  • Drywall and Acoustic
  • Rough Carpentry
  • Casework Installation (may also bid out)
  • D/F/H installation
  • Division 10 installation

BC-02   Electrical Demo Assist
BC-03   Plumbing & Piping Demo Assist
BC-04   Under Slab Plumbing Only 

Bid Package #1. Bing Fit out
BC-05   Casework Materials

BC-06  D/F/H Materials
BC-06   Toilet & Bath Accessories Materials
BC-07   Wall Protection Materials
BC-08   Cubicle Curtains
BC-09   Misc. Steel
BC-10   Firestopping
BC-11   Caulking
BC-12   Aluminum & Glass
BC-13   Electrified Door Openings
BC-14   Ceramic Tile
BC-15   Flooring
BC-16   Painting
BC-17   Fire Suppression
BC-18   Plumbing
BC-19   HVAC
BC-20   Electrical
BC-21   Communications
BC-22   Security (By KNS)
BC-23   Air & Water Balance
BC-24   Pneumatic Tube System
BC-25   Material Testing 

Bid Package #2. 6 Blue Enabling
BC-26   Messer Self Performance

  • Demo
  • Concrete
  • General Requirements
  • Drywall and Acoustic
  • Rough Carpentry
  • Casework Installation (may also bid out)
  • D/F/H installation
  • Division 10 installation

BC-27   Electrical Demo Assist
BC-28   Plumbing & Piping Demo Assist 

Bid Package #3. 6 Blue Fit out
BC-29   Casework Materials

BC-30  D/F/H Materials
BC-31   Toilet & Bath Accessories Materials
BC-32   Wall Protection Materials
BC-33   Cubicle Curtains
BC-34   Misc. Steel
BC-35   Firestopping
BC-36   Caulking
BC-37   Roof patching
BC-38   Aluminum & Glass
BC-39   Electrified Door Openings
BC-40   Ceramic Tile
BC-41   Flooring
BC-42   Painting
BC-43   Window Shades
BC-44   Fire Suppression
BC-45   Plumbing
BC-46   HVAC
BC-47   Electrical
BC-48   Communications
BC-49   Security (By KNS)
BC-50   Air & Water Balance
BC-51   Pneumatic Tube System
BC-52   Material Testing

Pickerington Bid Packages

Bid Package #00

BC-01   Messer Self Performance

·        Concrete

·        General Requirements

·        Drywall (may also bid out)

·        Casework Installation (may also bid out)

·        Division 10 installations (our normal stuff here)

Bid Package #1 Elevators

BC-01   Elevators

Bid Package #2 PreFab

BC-02   Prefabricated Units

Bid Package #3 Design Assist

BC-03   HVAC and Plumbing – Design Assist

BC-04   Fire Protection – Design Assist

BC-05   Electrical – Design Assist

BC-06   Pneumatic Tube – Design Assist

Bid Package #4 Deep Foundations

BC-07   Geo Piers

Bid Package #5 Site Utilities/Earthwork/Asphalt/Site Concrete and Landscaping

BC-08   Site Work (Earthwork and Site Utilities)

BC-09   Asphalt Paving

BC-10   Site Concrete (may self-perform but likely to bid out)

BC-11   Landscaping

BC-12   Site Furnishings

NOTE:  Stone Creek Drive widening will be separate and prevailing wage

NOTE:  Water Line will be separate and prevailing wage

Bid Package #6 Core and Shell

BC-12   Structural Steel

BC-13  Misc. Steel

BC-14  Roofing

BC-15   Exterior Framing and Sheathing (likely will include air and weather barrier here and not separately subcontract but might)

BC-16   Exterior Masonry (may decide to do design assist?)

BC-17   Metal Panels (may decide to do design assist?)

BC-18   Glass and Glazing (may decide to do design assist?)

BC-19  Fireproofing

NOTE: I don’t anticipate any waterproofing it will go in Messer’s concrete at SOG foundations

Bid Package #7 Fit Out

BC-20   Painting

BC-21   Interior Misc. Metals

BC-22   Casework and Millwork (material only with an alternate to add the installation should Messer decide to not do this work)

BC-23   Interior Aluminum

BC-24   Drywall and Interior Framing

BC-25   Acoustical Ceilings

BC-26   Flooring (resilient and carpet)

BC-27   Ceramic Tile

BC-28   Resinous Flooring

BC-29   Fire Stopping

BC-30   Air and Water Balancing

BC-31  Window Treatments

BC-32   Signage (this could be two packages interior and exterior?)

BC-33   Doors Frames and Hardware (material only)

BC-34   Door Frame and Hardware (installation only if Messer decides not to do this)

BC-35   Toilet Accessories (material only)

BC-36   Corner Guards and Wall protection (material only)

BC-37   Lockers

BC-38   Cubicle Curtains

BC-39   Division 10 specialty categories (i.e. marker boards, etc.)

BC-40   Toilet Partitions